Annual production survey 2020 

EAP 2020

Sources
Paru le :Paru le17/07/2024
Consulter

Actualité et ponctualité

Timeliness and TP2. Time lag - final results for U

At European level, the first results are disseminated 6 months after the end of the reference period ; at national level, 8 months after.
The 2-month time lag between the two releases is explained by the broader scope of the release nomenclature at national level than at European level.

Punctuality and TP3. Punctuality - delivery and publication for U

The timetable is generally respected. At European level, deadlines are always met.